Medium Voltage Chiller Installation

The Chillers pictured in this installation are powered by a 460 volt three phase system. The chiller starter controls the system and is interfaced to the Building Energy Management System.

High Pressure Steam Boiler installation

The three boilers in this installation are interfaced with building automation and are redundant to each other. The wiring to these systems is run in separate paths to reduce the chance of interruption of power.

Raven Aerostar

Project consisted of the construction of a specialty high altitude scientific aerostat hanger with 55’ side walls and large operable sliding door for entering and exiting the hanger. There were also special equipment connections of fiber and power to the aerostat landing pad. This project was completed in 2011.